Planning stock and repeat orders
Work back from the required arrival date by checking ready stock, production, packing and transit for each model.

Give the destination, required arrival date and quantity by model. Ask the supplier to separate ready stock, production, packing and transit estimates. Record the quoted date and what changes if artwork or specifications change.
Stock and scheduling
Which products are currently available from stock?
VIKTEC carries selected stock items. Model pages identify the product, but the catalogue is not a live allocation record. For an order due on a specific date, send the exact suffix, quantity and required dispatch date for a dated stock check.
What is the lead time for standard, branded, and custom orders?
VT13104's catalogue entry quotes 30–45 days and mentions stock availability. Use that as a model-specific planning reference. For a mixed, branded or custom order, give quantities, artwork and sample status, and distinguish the proposed dispatch date from delivery at destination.
Can you reserve stock or plan replenishment against our forecast?
Separate forecast demand from the firm quantity you want reserved. List each SKU, release date and minimum available balance. Reservation duration, cancellation liability and replenishment responsibility need written agreement.
How is stock availability confirmed before we place an order?
An availability check should state the SKU, quantity available to allocate, timestamp and any reservation expiry. Treat a quantity as reserved only when the order confirmation identifies it. Recheck if the quantity or requested date changes.
When does the production lead time officially start?
Use the start event in the order confirmation. For an artwork-dependent job, a purchase-order date and the date of final print approval can differ. Agree which outstanding payment, drawing or sample approval controls the production clock.
Shipping and order changes
Do any items require special handling because of batteries, liquids, or other contents?
Check what actually ships. A tool for fluid service may ship empty, while some kits may include a battery or liquid. Provide the exact SKU, contents, battery details or fluid data where applicable, and transport mode so handling requirements can be checked with the carrier.
Can you consolidate multiple SKUs into one shipment?
Consolidation depends on when every line is ready and where it must ship. List each model, pack count, ready date and destination. Compare waiting for the last line with the freight and receiving costs of separate dispatches.
Are partial shipments possible if some items are delayed?
Flag critical lines and the last acceptable date for each. Before approving a split shipment, compare the quantity, freight and documents for each dispatch with the original order and record the revised balance.
Which export and shipping documents can you provide?
Build the document list with your importer or broker. Typical requests include a commercial invoice, packing list and transport document. Specify destination, order lines and any origin or product evidence needed so availability and issuing party can be verified.
How will you communicate delays, shortages, or order changes?
Agree a named contact for order changes. Each update should identify the affected SKU, old and revised quantity or date, reason and proposed action. Record approval before substituting a model or changing a shipment.